Koelhuis WFO

In 1983 the first part of a large CA/ULO facility was build in Zwaagdijk-Oost, The Netherlands. The contractor was vegetable and fruit auction WFO (West Friesland Oost) and CO2 adsorbers from their former cold stores were re-installed and replaced in 1987 with new Besseling ones.

Leia mais
Obrigado por se inscrever em nosso Boletim Informativo.